Wuhan 80 square meters decoration budget list deta

2022-07-22
  • Detail

Project 1: Foundation Engineering

wall chipping (gypsum plaster) 574.40

wall/ground cement mortar leveling 1158.50

light brick wall (120 mm double-sided plastering) 1417.50

removal of floating window 480.00

project 2: Waterway and circuit engineering

strong and weak current construction (lump sum price) 5390.00

waterway construction (lump sum price) 1550.00

strong and weak current construction Weak current box installation 400.00

balcony water outflow 300.00

balcony hot water 300.00

Project III: guest restaurant and aisle

emulsion paint base treatment (putty) 1740.00

emulsion paint 696.00

gypsum board shaped ceiling 3392.50

shoe cabinet (including door, ecological board) 1860.00

decorative cabinet, wine cabinet body 1800.00

decorative cabinet Wine cabinet door 165.00

wooden curtain box (concealed) (Blockboard) 137.50

floor tile general specification (500 × 500< Size ≤ 800 × 800) 1734.20

item 4: primary bedroom

latex paint base treatment (puttying) 1180.00

latex paint 472.00

wardrobe cabinet (ecological board) 5280.00

bookcase (ecological board) 900.00

item 5: secondary bedroom

latex paint base treatment (puttying) 1000.00

latex paint 400.00

wardrobe cabinet (ecological board)3360.00

wardrobe door (ecological board) 330.00

second bedroom 2

emulsion paint base treatment (putty) 860.00

emulsion paint 344.00

wardrobe cabinet body (ecological board) 2400.00

wardrobe cabinet door (ecological board) 825.00

item 6: kitchen

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1265.00

general specification of floor tiles (size 300 × 300) 280.50

kitchen waterproof treatment 585.00

kitchen and bathroom package pipes 182.00

doorway stone paving 25.00

item 7: bathroom

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1023.00

common specification of floor tiles (size 300 × 300) 269.50

toilet backfilling and surface leveling 343.00

toilet waterproof treatment 810.00

kitchen and sanitary package pipes 182.00

lintel paving 25.00

toilet sewer protection works 200.00

item 8: balcony

emulsion paint base treatment (batch scraping) 412.00

emulsion paint 164.80

General specification of floor tiles (200 × 200 < size ≤ 800 × 800) 209.00

balcony railing base tiling 105.00

storage cabinet (ecological board) 960.00

storage cabinet door (ecological board) 330.00

balcony waterproof treatment 225.00

Item 9: miscellaneous

materials upstairs fee 300.00

materials transportation fee 300.00

indoor garbage removal fee 300.00

lamp installation 200.00

sanitary ware installation 150.00

hardware installation 100.00

finished product protection 300.00

ground fixation 300.00

item 10: other charges

the third-party Supervisor 999.00

the above is the 80 square meter and a half packaging in Wuhan sorted out by Xiaobian for everyone You also need to know about other decoration knowledge or decoration information. You can go to Wuhan home decoration network to get more information. If you have a house that needs to be decorated, you can enter the decoration bidding page of Wuhan home decoration network to provide you with free door-to-door room measurement service, formulate a plan quotation, and have a reduction or exemption of some decoration funds. See the activity page for details http://whjzw.net/zb/。

成都妇科医院

重庆银屑病医院

深圳男科医院

济南肿瘤医院

Copyright © 2011 JIN SHI